7828 Gangway Rebuild

IMG_3321IMG_3327

7828’s original south end gangway has been carefully dismantled, and the portal removed for storage along with the plastic curtain. The replacement from 8422, which is fitted with adaptor gear, had already been cleaned down, modifications removed, painted and had the normal pattern of top and bottom swivels fitted. With a pulley system fitted to the shed roof, the new portal was mounted on the old scissors, which have been overhauled and fettled to extend slightly more than previously, as on the vehicle we are copying. The new arrangement allows the gangway to couple to a Mk.1 ‘Pullman’ type gangway and extend further to do so, and incorporates improved swivel provision whilst retaining the ability to work with either type of standard LMS gangway.

The whole assembly is now being painted prior to installation of replacement bellows, then there are a number of clamps and fittings to refurbish as well as new floor plates to process.

 

IMG_3325

7828 Progess July 2013

Work continues on 7828. Despite the carriage shed becoming a sauna, the beading junctions have been fitted, sealed down, pins punched, filled and sanded. Half of the roof guttering has now been fitted, and the recently fitted roof ventilators have been glossed, along with the centre portion of the roof. Completion of the gutter allows final sealing and painting of the roof to take place, so the second half is a priority.

The strips of beading to connect the junctions are next on the machining list.

7828 was never modified to allow it’s gangways to be connected to a BR Mk.1/Pullman/LNER gangway. This is fine if we want to run it with just LMS/GWR carriages, but as at least initially 7828 must be compatible with Peak Rail’s Mk.1 stock, a gangway must have additional clamps and platework added. Rather than cut and weld the original part, the south end gangway has been selected to be fitted with a replacement gangway end portal. The donor gangway was sourced from LMS TO No.8422, the carriage which was a WWII ambulance, repatriated from Germany after the war, and one time resident at the Longmoor Military Railway. It has lost it’s original gangways, gaining some off something else instead. When it is restored at Rowsley, they will need to be dismantled and rebuilt anyway, so for the time being it has been possible for 7828 to ‘borrow’ a gangway portal – which happens to have full adaptor gear. This has been removed from 8422, stripped back of all fittings, cleaned down and painted. Some surplus outrigger brackets have been removed, and the portal is now ready to have swivels reattached, prior to fitting to 7828 with new bellows.

Work continues apace on the patterns for the light fittings, and the first step in the production of the replacement interior passenger communication cord fittings has been undertaken, with an order for the 3 patterns placed.

Samples of moquette have been received, and discussions continue on the production of the replica ‘fawn rep’ which the carriage will be trimmed with when completed.

Gutter takes shape at the north end of 7828
Gutter takes shape at the north end of 7828

Beading around window bay

Bob Matkin sanding beading; all pins are to be punched in, filled and then sanded smooth
Bob Matkin sanding beading; all pins are to be punched in, filled and then sanded smooth
Derek Riley removing modifications to the replacement gangway portal
Derek Riley removing modifications to the replacement gangway portal
%d bloggers like this: