7828 – May 2014

IMG_3397IMG_3403IMG_3399P1000507IMG_3407

 

A month of careful finishing jobs- the pile of retrimmed seat sections is growing, both sides of the exterior have received 3 coats of Midland Maroon gloss, and the ceilings painted a final 2 coats of white enamel before the brass vent covers were applied.

The old floor covering has been removed ready for the new in a few weeks. A single new window bolection has appeared to check fit and decide on any final changes. Odd jobs continue on the rebuilt south gangway, with some of the smaller fittings remaining.

Comments are closed.