Ceiling

It has been a long job, but the entire ceiling has been painted in brush filler, laboriously rubbed down (thanks for your help Dave), and then the lighting patresses and beading fitted. As I write this, there are 6 pieces of beading left to screw in, the other 43 having been (in some cases quite literally) bent into shape and secured in place.

The vestibules and toilets were particularly tricky, as the angle of the partitions and curve of the roof required 3 different flavours of curved hockey sticks.

As we’re almost there with the beading, Dave and Bob have started throwing more filler about. Once that’s done (I haven’t tried to count all the holes, I thought it would be depressing), we can start to think about showing it a paint brush.

Trevor continues to apply further layers of undercoat to his gangway end door, and James has cleaned up the last roof vent and carefully wire brushed and sprayed the first components of the passenger communication gear.
Mike’s heater installation continues with the preparation of some 40′ of timber moulding to which the heater brackets are secured along the length of the saloons. This has been cut to length, drilled and primed.

The epic tasks of beading the side, and applying the roof vents are almost upon us, help always welcome.